Safety
|
| Project Profile |

|
| Client: |
Riley Stoker Corporation |
| Description: |
Modification of Superheater Surface |
Location:
|
CNF Ryegate, VT, KES Fitchburg, MA, CNF Chateaugay, NY |
Synopsis: Perform field
modification to remove surface from the low temperature superheater.
Provide all labor, supervision, and tooling at each location to
modify and reduce the heating surface of the low temperature superheater section. Back
superheater element required the removal of a section of tube with a minimum of two field
cuts. The tube ends then needed to be machine end prepped per detailed engineering
standards. All field cuts and prepping were performed with pneumatic tooling to prevent
slag and contamination from entering the superheater steam side. Provide all modifications
to existing alignment bars including new weld attachments and supports. Install all spacer
bars to evenly space and align the elements.
Provide all Quality Assurance Inspection, detailed weld procedures,
Authorized Inspection services and completed R1 code documentation.
|